Method · Sources & Lineage

Find what already exists before claiming invention.

CCI's current questions intersect with substantial existing bodies of knowledge. Where an antecedent exists, it should be identified and credited.

Healthcare workforce planning

Needs-, service- and competency-based approaches substantially precede CCI's questions about translating need into workforce or capability requirements.

Needs assessment

Established traditions distinguish desired conditions, present conditions, gaps, requirements and interventions—an important antecedent to requirement-before-solution reasoning.

Human Performance Technology

Performance analysis asks whether a problem is actually caused by knowledge, skill, resources, incentives, information, workflow, environment or other system conditions.

Systems & requirements analysis

Requirements disciplines distinguish what a system must accomplish from the architecture selected to accomplish it.

Operations & decision science

Demand, capacity, queues, variability, uncertainty, resource allocation and staged commitments are directly relevant to expansion and adjustment decisions.

Human factors & work as performed

Adaptation, variability, workarounds and differences between prescribed work and work as actually performed may overlap substantially with CCI's less-visible-work questions.

Antecedents under review

Current prior-art work includes healthcare workforce-planning literature; Tomblin Murphy and related work; Mager & Pipe; Roger Kaufman; Rummler & Brache; Thomas Gilbert; Human Performance Technology; systems and requirements engineering; operations and decision science; and human-factors/work-as-performed traditions.

Similarity to existing work is not evidence that CCI independently invented an idea. CCI aims to distinguish what it observed, borrowed, adapted, synthesized, proposed and actually demonstrated.

Working status of the six-part architecture

Capacity State: synthesized / proposed taxonomy. Expansion Threshold: synthesized. Marginal Demand Absorption: CCI-proposed working construct / prior art unresolved. Capability Requirement: adapted. Delivery Constraints / Architecture Fit: synthesized / extended. Titration: synthesized / proposed operationalization.

These classifications should change when the evidence warrants it.

Working Architecture → · Help improve the lineage →